Take large front speakers off their dollys
Solder XLR connectors
Strap EVERYTHING under the first floor (this is not easy to figure out but must happen before we roll)
Position all four EONs
Create grills for new subs (return old one)
Place new wash lights on second floor
Create fiber optic art
Create entry way
Create shade structure
Confirm all power draws
Locate back-up generator
Get shop ready for packing
Create packing list for the playa
Build swamp coolers
Pillows for dome
Toe kick both decks (screw a 1″x2″ border of wood around the edge to make sure things [chairs, bottles, instruments] don’t roll off)