«

»

Aug 16 2014

Print this Post

To do list 08/15/14

Take large front speakers off their dollys

Solder XLR connectors

Strap EVERYTHING under the first floor (this is not easy to figure out but must happen before we roll)

Position all four EONs

Create grills for new subs (return old one)

Place new wash lights on second floor

Create fiber optic art

Create entry way

Create shade structure

Confirm all power draws

Locate back-up generator

Get shop ready for packing

Create packing list for the playa

Build swamp coolers

Pillows for dome

Toe kick both decks (screw a 1″x2″ border of wood around the edge to make sure things [chairs, bottles, instruments] don’t roll off)

Permanent link to this article: https://unaverz.com/wp/to-do-list-081514/

Leave a Reply