Showed up and Jeff was hard at work framing the top floor. Sean was busy getting Dairy tip-top. Sheri immediately got to work cutting two 52″ steel beams for the front and then welding them into place.
My task today was to update the server so the iOS WordPress uploads work correctly. I then …
Continue reading »
Permanent link to this article: http://unaverz.com/wp/sound-bending-and-a-bit-of-welding/
The factory is organized, stair welds are being finished and the top floor is going up!
…and we are in the hunt for a sound system worthy of the georgeous monster of a grand time we are building π
We are specifically looking for three sub woofers and two mid/highs.
Sub #1: 29″ x 37″ …
Continue reading »
Permanent link to this article: http://unaverz.com/wp/top-floor/
Steps were completed today. Yeah! The world looks totally different from the top π
Permanent link to this article: http://unaverz.com/wp/steps/
Lots and lots got done… not the least of which we played pool over at Buck’s ’til the wee hours.
http://youtu.be/2XDGQayrOjw
Permanent link to this article: http://unaverz.com/wp/balls/
We put in a full work day today and ended it with a fabΓΌ BBQ chef’ed by David.
Sheri welded. Sean framed and cut. Daniel programmed. David drilled. Keith cut steel. Kat organized, sent emails and modified clothing. Jules procurred outfits. Jeff supervised, welded and designed. I welded and designed. And, well… Buck was …
Continue reading »
Permanent link to this article: http://unaverz.com/wp/a-full-work-day/
Below are some choice images of our designs for 2013 and some links to posts that talk about them.
Drawings β 04/24/13 Design Ideas β 03-25-13 3D Designs β 04-08-13
Permanent link to this article: http://unaverz.com/wp/designs-2013/
Mark and I took a trip out to visit the folks at Cool Neon. After lots of product demonstrations and price lists and maybe an hour of talking about designs, I believe we have settled on a staged approach to lighting our upper floor.
Step 1) Light the rings with Total Control Lighting (TCL) LED’s …
Continue reading »
Permanent link to this article: http://unaverz.com/wp/radical-lighting-journey/
I am proud to announce that as of exactly 7pm on July 1 all the structural steel for the top floor of UNAVERZ is now in place! Woot!
I feel like I have been on a journey similar to climbing a mountain. It is ony after you come down from the peak that you …
Continue reading »
Permanent link to this article: http://unaverz.com/wp/steel-in-place/
Sean and I got real handy with the hammer and grinder while putting up a other cross member.
Jules had the bright idea to ask Buck for his thoughts on art and before you knew it we had a full-on art redesign of the top floor including pulleys, pivots and lots of flashing lights. …
Continue reading »
Permanent link to this article: http://unaverz.com/wp/more-welding-and-redesigns/
Sean and I put in some welding time. Sean suggests we run the stairs sideways and Jeff set to work figuring out how to do that. I ordered more steel only to find out we need to cut off some inches on our existing stock.
Mistakes are made. Fortunately they can be corrected with …
Continue reading »
Permanent link to this article: http://unaverz.com/wp/welding-welding-and-redesigns/