«

»

Jun 04 2014

Print this Post

Tuesday night shift

Sheri, Sharifa and I met up after 9pm and worked till we dropped. Sheri focused exclusively on TIG welding our aluminum tubes. Sharifa and I set about cutting and building the connectors that will attach to the truck.

20140604-012307-4987734.jpg

20140604-012323-5003945.jpg

20140604-012340-5020886.jpg

20140604-012341-5021305.jpg

A couple of hours later we were ready for assembly. With Sharifa and I holding the line, Sheri did a yeoman’s job of tacking everything into place.

20140604-012923-5363877.jpg

20140604-012947-5387084.jpg

20140604-023759-9479979.jpg

20140604-013042-5442569.jpg

20140604-013043-5443058.jpg

After the three connectors were secure, we lifted the line off so Sheri could get at all the angles.

20140604-023948-9588039.jpg

20140604-024007-9607844.jpg

UNAVERZ is going to be beautiful this year. I love the way she is coming along. Can’t wait until Friday when she gets to be seen for the first time.

20140604-024129-9689263.jpg

Permanent link to this article: http://unaverz.com/wp/tuesday-night-shift/

Leave a Reply