Started by drafting Sheri’s Subaru to haul 18 additional aluminum tubes. We even got Jesykah to look up the highway rules to make sure we were legal (umm… sort of.)
Evan showed up as we were unloading and gave Sheri a two hour welding class. While they worked I fixed some of the tools that needed attention along with cutting and notching more connectors arms.
With the exception of the 5 strands of LEDs coming on Thursday, I believe we have everything required for the soft launch on Friday. Now all we have to do is put in the time to create the art.
Onward.







