Time to take the top off.
First Jeff is going to build two braces to hold the top. Then we are going to cut across the roof right behind the last remaining wall. At that point, if the whole thing has not fallen, we will cut the roof in sections.
It’s 2 now. Lets see when we are done 😉
Will the 4″ grinder work?
Nope. Works ok for the top but it is not big enough for the sides. Time to break out the sawzall.
That worked.
And 1 hour and 30 minutes later…











