«

»

Jul 21 2013

Print this Post

Lots of screwing going on

David showed up to demonstrate his screwing technique. While breaking a lot of tips in the process, he successfully completed screwing the bottom floor and almost finished off the top floor before his body was spent.

Sam and Elise showed up to help frame the skirt and assemble the kitchen structure with Sharifa. Mark and Naomi joined us for a Sol Food break and to discuss lights and programming.

Sheri continued to lay down metal as Jeff designed and constructed Ra’s beak.

20130721-081339.jpg

20130721-081402.jpg

20130721-081414.jpg

20130721-081426.jpg

20130721-081543.jpg

20130721-081627.jpg

20130721-081647.jpg

20130721-081703.jpg

Permanent link to this article: http://unaverz.com/wp/lots-of-screwing-going-on/

Leave a Reply