Bella, Sheri, Michael, Ed and I spent the day fixing up the truck. We stretched fabric, moved all the luggage off the truck, attached the lights and got them all working. By 6:30 it was time for a drink.
From there on out it was a continual rage of madness that seemed to spiral out of control until after 2. American Steel celebrated their 6 years by hosting an amazing party with live bands and plenty of activities (including silk screening), Love Potion gave Glenn and Greg a private tour, Horse threw an incredible high energy gig complete with circus performers and fire, the Envelope Engineers hosted the Welding Olypics (truly a Only-At-American-Steel event)… and we held an intimate gathering with Numbskull with a hundred of our closest friends.
When Glenn and I rolled out of there just before 3, we wore crooked smiles and vowed to do this again as soon as possible. Good Times!















1 ping
Is it time for a switch? » Unaverz
May 6, 2015 at 4:34 pm (UTC -8) Link to this comment
[…] through the years as is to be expected with a 1982 26,000 GVW truck. Our crew has been operating on Craig’s philosophy of ‘make what you have work,’ but are now looking at major repairs on a 33 year-old […]