«

»

Apr 10 2014

Print this Post

To-Do List – 04-10-14

Please feel free to add comments below.

Railings

-finish grinding
-enlarge the holes-one per end rail
-autoclear finish (Max?)
​-build first floor railings
    -right side: high bar for hands above head level; and low rail? Or waist height?
    ​​-left side: replace straight galvanized rail with wavy steel?

Kick Board

​-top floor to protect lobata if necessary

Tune Up Truck

-Ricardo

Build Lobata

​-EMT and connectors
​-chicken wire or mesh?
-attach/unattach lobata to truck
​-fabric (iridescent bluish)
​-material for lobes (tap plastics?) – hinges for movement?
​-rainbow flags (cilia) –fabric –outside lobata

Lights

​-chasing LEDs (inside plastic tubing?) outside Lobata
​-additional LEDs curving random lines inside lobata
​-spotlights (top floor, skirt?)

Skirt

​-wood and chicken wire?
​-fabric or paint?
​-ocean and/or coral theme?

Ceiling (first floor)

​-new fabric (Seani?)

New Back Stairs (to ground)

-create/update stairs to enter UNAVERZ

Back Entry

​-textural/tactile cilia/mouth

Stairs

​-Brass sheet covers on the tread (or brass metal coating)
​-Brass metal coating on circular railings

Posts

​-Brass sheet covers (or brass metal coating)

Floors

​-New murals (ocean?)

Dome

​-cushions for the floor (foam, with some kind of cover?)
​-new mural
​-lights

Sound System

​-Test and train folks how to use it
-Assemble music equipment (bass, sax, mics, mic stands, monitors)
-wireless system to communicate with mobile DJ booth
-100′ XLR cables for additional sound system connections
-record all performances
-wirelessly broadcast all performances

DJ Set Up

​-build mobile (portable) DJ table/booth
​-power table/booth
​-create portable canopy with lights?

Power
​-mount and test generators in battery box
​-test batteries and battery charger

Shade Structure (top floor)
​-do we want one?
-if so, design and build shade structure

Infrastructure Improvements

-build storage for musical instruments
-build seating behind front speaker
-run conduit for power cables to first and second floors
-run conduit for live equipment cables from sound cabinet to first and second floors

Workspace Improvements

-Build second floor above container
-Build steps (with railing!) to second floor
-Outfit second floor lounge
-Organize tools inside container

Permanent link to this article: http://unaverz.com/wp/to-do-list-04-10-14/

1 ping

Leave a Reply