To do list 08/10/14

Take down and label all skirt ribs

Store skirt hardware

Hang sub cabinet with 5 bolts

Create and hang two separate small sub cabinets

Take large speakers off their dollys

Reposition rear speakers behind last post and secure the stack

Create instrument storage box

Run XLR cables upstairs and two boxes downstairs

Weld speaker posts to top rails

Run electrical to all top floor speakers speakers

Create entrance way

Create shade structure

Create frame for skirt on truck cab and pull fabric

Create sheet for dome foam

Pillows for dome

Secure dome (3 bolts with nuts)